top of page
kim-son-fountains_3c46163d-a529-98e0-14d04f2afe9f9046.png

KIM SÓN
RESTAURANTS

Interior Shell Buildout

LOCATION

Houston, Texas

DELIVERY METHOD

Negotiated Sum

SPECIALITIES

Interior Shell Buildout
Complex MEP Systems
Food Service Equipment

 
Complex MEP Systems
kim-son-fountains_3c46163d-a529-98e0-14d04f2afe9f9046.png
Food Service Equipment

PROJECT OVERVIEW

KIM SÓN Sugar Land | $1,500,000 – 10,250-SF • Ground-up new construction of Asian restaurants which incorporate three full-sized kitchens within one with Chinese, Vietnamese, and Dim Sum fusion. Each seats 1,000-patrons and have high-quality fixtures and finishes including chandeliers, stone flooring and accents, and detailed millwork. Full-service restaurants with banquet facilities, food court outlets, industrial kitchens, and bars.

​

KIM SÓN Downtown | $1,000,000 – 15,000-SF • This project was on the ground-level of the 300 Milam Parking Garage and involved the removal of paving, installation of underground utilities, and pour back of slab on grade. Full MEP Systems were installed including a complete commercial kitchen with industrial exhaust hoods that were required to be vented through the parking levels above. The entire parking structure was fully-operational during construction

RESTAURANT-KIM SON
bottom of page